Nova Drop Head Slab
Formwork System

Build your Slabs in One Week when Others do it in Two!

Why wait for full stripping when you can drop, release,
and reuse panels instantly?

      Invention started here. Evolution is driving it!
      Get Nova Drop head Slab System

      Nova Drop Head Slab System lets you strip your main shuttering panels 3-7 days after a concrete pour, significantly boosting your site’s
      speed. This is achieved because the drop heads and bearers stay in place, holding the slab safely. The result is faster inventory turnover and
      quicker cycles across every floor.

      Built for Speed, Built to Support: Switch to Nova Drop Head

      • Early Panel Stripping
      • Zero Shuttering Oil
      • Lightweight Heads
      • Superior Slab Finish
      • Maximized Cycle Time
      • Reduced Labor for Stripping
      • Integrated Safety
      • All-Weather Reliability
      • System Compatibility

      The Next Deck Slab Starts Here. Choose Nova Drop head System

      Email us at info@novaformworks.com

      Give us a call today @+91 70650 60355

      Nova Drop Head Slab System Velocity Cycle

      The system is engineered for fast, safe component reuse without compromising the curing slab.

      Install & Pour

      01
      Set up the full Nova system (props, runners, panels) and pour the deck slab.
      Once the slab is structurally stable, activate the Drop-Head mechanism to safely detach the main panels and runners from the prop heads.
      02

      Release & Drop

      Cycle & Support

      03
      Strip and relocate your panels and runners immediately to the next level, leaving the necessary props in place to maintain load support during final curing.

      The Nova Drop Head Slab Systems Advantage

      Time

      Reclaim components 3 to 7 days sooner than traditional systems, accelerating your floor cycle.

      Safety

      The prop remains securely in place, ensuring continuous structural support during de-shuttering.

      Cost

      Minimise inventory needs by maximizing the reuse rate of your existing formwork components.

      Why Choose Nova Formworks: Built on Proof

      When you choose us, you're not just buying a drop-head system; you're investing in a sustainable future, proven on multiple
      compliances.

      Sustainability is our Core
      ISO 9001:2015 Certified
      CIDC Approved Vendors
      Patented Technology
      18+ Years of Invention
      45+ Years of Industry Mastery
      Certified Engineers
      10+ Industrial Awards

      Form Fast, Drop Delays.

      Give us a call today @+91 70650 60355

      FAQs

      FAQs about
      Business with Nova

      Still have questions?
      Our team is ready and waiting to help.

      Get in touch
      The main advantage is the ability to strip the formwork panels and main beams early (often within 03 to 07 days), allowing those components to be immediately reused on the next floor, drastically speeding up the construction cycle.
      The drop-head mechanism allows for the fast removal of the panel and runner components while leaving the vertical shoring prop securely in place to continuously support the slab during its final curing phase.
      No. The drop-head pin is typically released using a standard construction tool like a hammer.
      No. The setup involves simple, repeatable steps like painting prop marks, placing props with tripods, installing runners, and then placing the panels, similar to standard modular systems.
      Yes. By maximizing the cycling speed, you minimize the overall formwork inventory required for the entire project, leading to significant cost efficiency and a better return on investment (ROI).

      We’re More Than Support - We’re Your Building Partner

      Give us a call at +91 70650 60355!