Why wait for full stripping when you can drop, release,
and reuse panels instantly?
Nova Drop Head Slab System lets you strip your main shuttering panels 3-7 days after a concrete pour, significantly boosting your site’s
speed. This is achieved because the drop heads and bearers stay in place, holding the slab safely. The result is faster inventory turnover and
quicker cycles across every floor.

Email us at info@novaformworks.com

Give us a call today @+91 70650 60355
The system is engineered for fast, safe component reuse without compromising the curing slab.



Reclaim components 3 to 7 days sooner than traditional systems, accelerating your floor cycle.
The prop remains securely in place, ensuring continuous structural support during de-shuttering.
Minimise inventory needs by maximizing the reuse rate of your existing formwork components.
When you choose us, you're not just buying a drop-head system; you're investing in a sustainable future, proven on multiple
compliances.
Give us a call today @+91 70650 60355
Still have questions?
Our team is ready and waiting to help.
Give us a call at +91 70650 60355!
© 2026 Nova Formworks Private Limited, All right Reserved