Nova Sustainability
& Safety

At Nova Formworks, sustainability and safety is our core to serve your
construction projects.

      Nova Panel Repeatability

      Nova Panels don’t just last long – they stay reliable. We assure 100+ uses and many have pushed them to 150+ pours with no trouble at all. With such uses, we support sustainability as it’s only the end. There’s more to it where we close the whole loop and re-starts the cycle.

      Nova Panel Repeatability

      Nova Panel
      Exchange Program

      At Nova, we are committed to promoting sustainability and supporting long-term customer value. Our journey doesn’t end after your purchase! Our Plastic Panel Exchange Program that allows customers to return used plastic panels but only at the time of purchasing new panels.

      How Does It Work?

      Under this program, eligible used panels can be exchanged for new ones at a fixed replacement rate, promoting recycling and responsible usage.

      Replacement Ratio

      Exchange used panels at 25% of their area.
      For every 4 sq. m of returned panels, receive 1 sq. m of new panels. This rate is fixed, regardless of panel condition or age.

      Easy Documentation Options
      • 1. Exchange via Tax Invoice
      • 2. Exchange via Delivery Challan / Credit Note
      Nova Panel<br> Exchange Program
      Logistics & Responsibility

      Customers are fully responsible for all transportation costs and logistics, including freight, loading, unloading, and any incidental charges, for sending the used panels to Nova and receiving the replacement panels from NOVA.

      Exclusions & Limitations

      · This program applies only to Nova plastic panels, excluding accessories like Tie Rods, Wallers, Props, Wing Nuts, and other supports.
      · Only identifiable, partially usable panels are accepted; severely damaged or third-party panels are ineligible.
      · Nova reserves the right to inspect and assess all returns before issuing new panels.

      Rights Reserved

      §  Nova may amend, suspend, or discontinue the program without prior notice.
      §  All disputes are subject to Nova’s final decision

      Customer Support

      For queries on eligibility, documentation, or the exchange process,
      contact your Nova representative or email: customersupport@novaformworks.com

      Worker Safety Standards at Nova Formworks

      At Nova Formworks, every system we design is built around three essentials: safer work environments, sustainable construction practices, and compliance with recognised quality standards. This page outlines how our patented modular plastic formwork supports these commitments across every project scale.

      Eco-Friendly Initiatives

      Nova Formworks supports sustainable construction through long-life materials, zero-waste design, and responsible end-of-life management.

      High Reusability for Low Environmental Impact

      Nova panels deliver 100+ reuse cycles (often 150+ in many client projects), reducing reliance on timber and cutting construction waste generated by short-life formwork.

      Zero-Waste Material Philosophy

      Our panels do not swell, absorb water, crack, or degrade – meaning no on-site chipping, breakage, or disposal waste.

      100% Recyclable Material

      Under the Nova Exchange Program, end-of-life panels are sent back to us for full material recovery and recycling, preventing landfill contribution and supporting circularity in construction

      No Chemical Release Agents Required

      Smooth panel surfaces eliminate shutter oil absorption and reduce chemical usage on site.

      Energy-Efficient Manufacturing

      Solar integration at our units reduces dependency on non-renewable energy and lowers manufacturing emissions.

      Compliance with OSHA / IS Codes

      Nova Formworks is engineered to support safe construction practices aligned with OSHA principles and relevant IS code requirements used in concrete and formwork operations.

      OSHA-Aligned Handling Safety
      • Lightweight components reduce manual lifting strain.
      • Smooth edges reduce cut and pinch hazards.
      • Non-corrosive material prevents rust-related injuries.
      Supports IS Code Requirements for Concrete Work

      Our system is designed to behave consistently under load, supporting core expectations of IS standards such as:

      • safe load transfer
      • stable staging
      • uniform alignment
      • predictable stripping without force

      These factors contribute to a safer pour and reduce errors caused by material deformation.

      Certifications – Quality, Safety & Process Standards

      Nova Formworks operates using structured quality systems to ensure consistent, safe, and reliable production.

      ISO-Certified Management Systems
      ISO-Certified Management Systems

      As highlighted in your documentation:
      ISO 9001: Quality Management System for controlled, consistent production

      Standard Compliance &  Material Checks
      Standard Compliance & Material Checks

      Our engineered plastic formulation and modular system follow industry expectations for

      CIDC Approved Vendor
      CIDC Approved Vendor

      CIDC-approved vendor reinforces national-level validation of our manufacturing, quality standards, and professional management systems

      Safety Practices

      Worker safety is designed directly into the Nova system – not added as an afterthought:

      • Lightweight Handling Reduces Injury Risk
      • Safe Assembly Without High-Skill Dependency
      • No Sharp Edges, No Rust, No Swelling
      • Predictable Behaviour = Safer Sites
      • Reduced Fatigue for Semi-Skilled Labour
      • Factory Safety & Precision Automation

      Transparency and quick response are part of our commitment to you.

      Built for Safer, Greener, Compliant Construction

      Nova Formworks aligns engineering, sustainability, and worker safety into one unified system. For contractors, consultants, and developers, this means:

      • fewer risks
      • less waste
      • more predictable execution

      and a construction workflow that meets modern safety and environmental expectations.