How Smart Formwork Can Save 30% Project Time and Multiply Site Efficiency

Every construction project, regardless of the scale, involves some complexities. Unanticipated delays often lead to huge cost overruns. Completing large construction projects takes twenty per cent more than the scheduled period, increasing the cost nearly eighty per cent over budget. 

No construction businesses want to deal with such expensive delays, leading to losses, reputation damage and deferred ROI for stakeholders. The use of smart formwork in construction is increasing these days compared to traditional formwork. The advanced formworks help save thirty per cent of project time.


Traditional Formwork Systems Cause Costly Delays

Timber and steel have been the only materials for formworks for decades. Despite their effectiveness, they are responsible for adversely impacting the speed of a construction project. 

  • Timber is ideal for creating different kinds of formworks. But, fabricating them is labour- and time-intensive on-site. Moreover, they are prone to damage and have a minimal reuse value. 

  • It is easier to reuse steel formworks for concrete construction, making the final structure more durable. But, transporting, lifting, installing and dismantling formworks made of heavy-weight steel can take substantial time, effort and cost. 

Every construction business that still uses conventional shuttering systems finds it challenging to complete a project within the deadline. These formworks’ certain inefficiencies or drawbacks end up slowing down the construction cycle time.


Smarter and Sustainable Plastic Formwork Solutions

The construction sector in India is booming primarily because of the extensive use of smarter, greener and more cost-effective alternatives to traditional formworks. A leading plastic formwork manufacturer in India, like Nova, designs these formworks for superior speed and sustainability.

The durable formwork solutions made of high-strength plastic are highly sought after due to their lightweight and modular design. Nova’s panels are easier to carry, install and dismantle, eliminating the need for multiple labourers and heavy-lifting machinery.


Smart Formworks Expedite the Construction Cycle

Modular technology-equipped plastic formworks have a profound impact on a construction project. These alternatives to traditional shuttering systems are instrumental in saving substantial time and effort. Here’s how: 

  • Assembling Nova’s plastic formwork in construction is hassle-free because of the built-in interlocking mechanism. 

  • It takes minimal time to conduct the dismantling procedure as these formworks are easier to unclip and remove.

  • The requirement for several labourers, which increases the overall expenses, won’t be there; handling these lightweight panels is a cakewalk.

  • The generation of on-site waste is significantly less because modular plastic formworks for concrete construction don’t need much cutting and fabrication. Thus, the worksite remains cleaner and safer.

Real Outcomes: Up to 30% Quicker Project Completion

The increase in efficiency is not just hypothetical. The revolutionary power of smart formwork is visible to everyone due to the real-world project data. Compared to projects using conventional steel or timber systems, those using Nova’s advanced panels have reportedly achieved a 30% faster completion rate.


Final Words

Harnessing the unmatched power of Nova Formworks’ modular, durable and reusable plastic formworks is prudent. The esteemed formwork manufacturer in India prioritises all the crucial elements when designing these shuttering solutions. These methods enable contractors to complete projects more quickly, more affordably, and with improved overall site efficiency. These formworks address a fundamental inefficiency in concrete building, eventually increasing their profit potential.