Learn About MIVAN Aluminium Formwork

Learn About MIVAN Aluminium Formwork

Today, numerous real estate developers use Mivan technology as it ensures the durability of the structure. It is the crucial factor that makes it an ideal choice for the construction of several houses in a short duration. It is worth noting that Mivan shuttering could leave behind the old-style ways of construction.   

Mivan Formwork

Mivan shuttering/ formwork refers to an aluminium formwork system. It is unique as well as an advanced technique of construction that provides speed without deteriorating durability or strength. It is an economical variant of the old-style construction method that is time-taking as well as labour-intensive.

It is an ideal method of construction for larger projects as all the components such as slabs, beams, staircases, walls, etc. are made from concrete. Just like the modular kitchens replaced traditional kitchens offering aesthetic appeal and great space efficiency, Mivan formwork helped with easy assembling as well as quicker construction.

Advantages of Mivan Formwork

The key benefit of Mivan formwork is that it helps fasten the construction’s speed as well as yields better construction quality. The formwork is lightweight which makes it easier for labour to handle it. The number of the joints is less, therefore, it requires low maintenance. It is important to note that the shuttering has a fixed set of procedures, therefore, you do not require skilled labour for the installation.

As the surfaces are smooth, it offers a natural aesthetic and there is no need for plastering. The less cost of fabrication results in less debris generation. The best thing is that you can use it nearly hundreds of times because aluminium does not have the problem of corrosion. And, it is resistant to seismic forces as well. 

Work Cycle 

Here are the keys steps involved in the work cycle of the Mivan shuttering

  • On the first day, there would be the erection of the vertical reinforcement bars as well as one side of formwork for the part of one floor.
  • On the second day, there would be the erection of another side of vertical formwork as well as the floor’s formwork. 
  • On the third day, labour would fix the reinforcement bars for the floors as well as cast the slabs and wall. 
  • On the fourth day, the labour would remove the panels of vertical formwork once the 24 hours are complete. They would leave the props in place for nearly 7 days and the floor slab formwork for 2.5 days.

This way construction happens quickly. In case you are planning to invest in Mivan formwork, Nova Form Works makes an ideal choice. We have experienced engineers and they can assist you with proper guidance for your construction project and requirements.

Leave a Reply

Your email address will not be published. Required fields are marked *